Note: points of contact must be available post-submission in the case NSTXL or its government partners have questions.
Please note: the non-technical point of contact will receive the submission confirmation email with the link to upload proposal files.
This form accepts up to 15 subcontractors. If you have more than 15 subcontractors, please include a document in the submission that lists all subcontractors including organization name, organization type, CAGE, and FOCI.
List all locations where developement work will take place, including the CAGE if different from the one provided in the first form section. This includes all subcontractor locations where work will take place.
Confirmation of Required Documents
File Preparation
All subfolders and documents should be collected into a single zip file. Please do not upload a collection of loose files.
After submitting this form, you will receive an email with a secure link to upload your proposal zip file. Your submission will not be considered complete until your proposal has been successfully uploaded through that link.